Exzelent.Marlengo

Information

The apartments 

Overall, the new building includes three villas and two residential units, in different sizes, which are designed as duplex apartments.   

The four smaller apartments break the rigor of a typical condominium with common areas and free space management. One of the main issues in planning was the sun orientation and orography of the terrain, whereby the energy supply from the sun can be optimally utilized and thus a high level of comfort with comfortable temperatures, during summer as winter.
All units are equipped with quality furnishing: bedroom and living room are equipped with parquet floors. All other rooms with highest quality tiles. The bathrooms are fitted with Villeroy and Boch trademarks products. For each individual apartment, a controlled ventilation system is provided which is constantly changing the used air with fresh air in all rooms. For window and external door insulation a sound and thermal insulation of the highest quality is guaranteed.

 

The execution

The residence is built on a total of 5 levels, 4 residential floors above ground and one basement floor. 

Due to the"Climate House A" quality, guidelines and environmentally conscious building only materials, which can allow this, can be used. The foundations and basement floors are built with reinforced concrete, all exterior walls with brick masonry. The residence is equipped with a centralized heating and cooling system, which by the energy-saving radiant heating (in the floor) is heating the apartments in an optimal way. The thermal power generation is based on a biomass boiler and connected to a briquettes heating system. Large windows and large terraces characterize the entire condominium. Special windows in wood aluminum construction offer a triple glazing for an optimal heat insulation, condensation reduction and burglary protection. The units are also equipped with a device for installing an individual burglar alarm. Great appreciation was given in the execution of the condominium, specified in the award of each contract to local companies. 

 

The schedule

Construction of the new residence was in April 2014 with delivery in autumn/winter 2015. Given the limited schedule there is the possibility to transform the interior layout of the individual units until the shell and adapted to the individual needs and desires.